When two channels share an archive, “approved” can mean the source file was cleared, a draft caption was reviewed, or a specific export was ready to post. A good queue makes the distinction visible. Each row tells the publisher which version can go out, on which channel, and what to do if it misses review.
1. Create a row for each placement
Use the publishing calendar to create one row for every planned use. If a source clip is used on two channels, make two rows with different placement IDs. Give each row the channel, scheduled time and timezone, file ID and version, caption and destination, approval owner, review deadline, and status. Point to the private permissions record by reference when one is needed. Keep the permission documents themselves in the place where access is restricted.
Use a versioned export name, such as SETUP-01-IG-v03.mp4. Label the caption and destination with the same placement ID. If you work alone, record yourself as the approval owner and review the assembled placement before moving it forward.
2. Define what ready means
| Status | When to use it |
|---|---|
| Draft | The export, caption, or destination is still being assembled. |
| In review | A named reviewer has the exact version and a deadline. |
| Ready | The reviewer cleared the version, caption, destination, and intended use for this channel. |
| Hold | A permission, channel rule, broken link, or missing decision needs resolution. |
| Published | The exact placement is live and the actual date or URL has been recorded. |
Record who approved the placement and when. Send it back to review if the export, wording, destination, or intended use changes after approval. That makes it possible to see whether the version currently in the queue matches the decision.
3. Set the deadline before the publish time
Work backward from each planned placement. If a creator needs a day to review the export and the publisher needs an hour to prepare it, schedule approval early enough for both. Batch the next few reviews into a repeatable slot. At the end of the review, decide which rows are ready, which need a named correction, and which should wait.
The creator clears the Instagram edit of a lighting setup clip on Monday. The YouTube version includes a different end card and destination. The second placement stays in review until the creator checks its own export and link. The queue records two decisions against the same source clip.
4. Decide what happens when a slot slips
Give important placements a backup row with its own approval. If the primary row misses the deadline, use the backup only if it is ready and serves the same purpose. Record the swap beside the original placement. If neither row is ready, keep the missed slot in the calendar so it counts in your review.
At the end of the week, group held or missed rows by cause. If four posts waited on an export, fix the handoff. If four posts waited on a decision, reserve a review window or reduce the next batch. A short reason code is enough to make the pattern visible.
Put the queue beside your calendar
Copy the next six placements into the worksheet. Fill the approval owner, deadline, and exact file version for each. Use your existing calendar for dates and the queue for decisions. Read the two-channel calendar guide
WORK WITH OCG
Need help putting the plan together?
The Creator Operations Sprint organizes a selected part of your existing archive and gives you a 30-day publishing plan for two agreed channels.
See a fictional Sprint sample Ask about the $750 Sprint See the full scope and priceTHE OBSIDIAN BRIEF / TWICE A MONTH
One useful idea.
One clear next step.
Practical creator workflows, free tools, and useful OCG updates. Two emails a month, with one clear next step.